Ace Restoration and Waterproofing Incorporated ACE Restoration & Waterproofing Incorporated
shim-white
"The Concrete Restoration Experts" shim-white shim-white slogan
shim-black side_recent shim-black shim_trans

Recent Projects

Featured Projects

Naval Air Station

Structural Characteristics

Reasons for Repair

Inspection Methods

Inspection Results

Deterioration

Repair System

Site Preparation

Demolition Method

Surface Preparation

Application Method

Repair Process

Unforeseen Condition

Unique Features

Pearl Harbor

Turbine Deck Load Capacity Restored



shim-black

Home > Recently Completed Projects > Featured Project > Application Method Selection

Featured Project

 

Application Method Selection:

Since the hanger bays are as high as eighty feet, seven high lifts were utilized to expedite the construction process and to eliminate scaffolding. The high strength polymer repair mortar was hand=applied and hand finished. The corrosion-inhibiting impregnation and the anti-carbonation acrylic coating were applied by air-actuated spray guns.

 

 

 

 

 

 

Previous page Continue to next page
shim-black
shim-black shim_trans shim-black shim_trans

ACE Restoration & Waterproofing, Inc.
620 E. Walnut Ave.
Fullerton, CA 92831
714.526.7366
Fax: 714.526.7965

shim_trans
shim-black

  ACE Restoration and Waterproofing Quick Service Overview:
  Concrete repair; concrete restoration, structural upgrade, epoxy injection,
  waterproofing, and more concrete technologies in Fullerton California (CA)
  by ACE Restoration and Waterproofing.

  Concrete Repair, Concrete Restoration, Epoxy Injection, Waterproofing

http://www.acerestoration.net/

 

about | services | recent projects | news | contact | sitemap | home

shim-black
shim-black

© 2013, ACE Restoration & Waterproofing, Inc.   

shim-black